The Miser Project

Miser Project
Construction Structure

miser>

index.htm>
2017-07-22 -11:41 -0700

Superior Structure: [none]
Local Infrastructure:
             index.htm Miser Project Construction Structure (this page)
      construction.htm  Front Porch Construction Zone
           c000000.htm  Front Porch Construction Zone Diary and Job Jar
  default.firedrill.htm
is a special page that can be overlaid on the default.htm entrance page (or any other page) when the site is being locked down as part of an incidence-response test.  Any page that can be replaced by a firedrill, quarantine, or standby page must have a means for being restored.
default.quarantine.htm
is a special page that can be overlaid on the default.htm entrance page, or any other page, to hold the place of a page that has been damaged or to block off other corrupted materials.
   default.standby.htm
is a special page that can be overlaid on the default.htm entrance page, or any other page, to indicate that the site is unstable while repairs are underway.
    livesearchauth.xml
page provided in support of search engines.
Immediate Content:        default.htm  Site Entrance Home Page
       keybase.txt  proof of keybase.io/ administrative authorities
      synopsis.htm  Synopsis about the Miser Project
              notation.htm  Discussion of Notation
             binsearch.cpp  Sample Algorithm Format (C/C++)
             binsearch.py   Sample Algorithm Format (Python)
Subordinate Structure:          _private/  (reserved)
        astraendo/ Abstraction Theme Material
          cgi-bin/  (reserved)
     construction/
  Construction Material
              dev
/  Miser Development Material
           images/  Site-Wide Images
        mt-static/  (reserved) Movable Type "Static" Material
            notes
/  Miser Project Notes
         readings/  Miser Project Readings
             [tbd]  to be defined further as Construction Structure is propagated further

Status:

Miser Project> repaving> 2007-11-11 announcement>


The Miser Project Is Being Repaved.

Migration to a new server introduced a number of problems that require repairs.  In addition to those defects, some older pages also need to be modified and reorganized for consistency across all The Miser Project.  While the site is being repaved to accomplish both kinds of improvements and upgrade to nfoCentrale-wide formatting, you may notice discrepancies and problems with links to site content.

Check the Site Repaving Project pages for additional details on the known defects and the approach to correction and upgrade. 

 

 

You're at the entry level of the Miser Project web site, http://miser-theory.info.  This top level of site content is referred to as the front porch of the site.  All public content is reachable by entry through the front porch, whether by browser navigation through links or by use of a URL that specifies a path deeper into the site. 

The fire-drill and related pages have never been needed although there were prospects at the time.  These can now be used, if ever needed, without first backing-up default.htm, because that page is now shared from a professional-appearance document engineering Project Notes folio.

This Construction Structure is the scaffolding on which the useful content and other web resources are organized.  Every accessible folder on the site can be found by navigation of the construction structure.  Some of them, such as this one, have a companion Construction Zone that is used to hold work items and details of that point of the construction structure and it subordinate construction structure.

This web page is part of the engineering, construction management, maintenance, and infrastructure of the Miser Project web.  You are welcome to explore this and other construction-information pages.   You'll need your hard hat and safety shoes.

If you'd prefer reading about the Miser Project instead of admiring the scaffolding, materials, and construction equipment on the site, go directly to the Miser Project entrance section.   If that doesn't work, return later.  Project can be blocked off whenever the construction crew is blasting in the area. 


Construction Zone (Hard Hat Area)

You are navigating Miser Project construction structure.

created 2000-05-07-13:42 +0200 (it) by orcmid
$$Author: Orcmid $
$$Date: 17-07-22 11:42 $
$$Revision: 27 $